High-rise office, Moscow

Green steel arches that run along the windows and rise into the ceiling, with daybeds set right at the glass. The designer drew it for an office high above the city, and we had to build it there, inside a finished fit-out.
We made the arches along the windows, the ceiling grids, the daybeds at the panoramic glazing and the planted frames in the café zone. Every element was welded and painted in our workshop in Bronnitsy, then assembled and installed on site by our own team. Installation was completed in August 2025.
The arches before they left the workshop.
Every arch was welded, painted and assembled in Bronnitsy first, then wrapped in film and taken to site. Drag the slider to see the same structures in the workshop and installed along the windows.










Scope of supply
Built in the workshop, assembled high above the city.
Every arch, grid and frame was welded and painted in our workshop in Bronnitsy, and the structures were assembled there first before they went to the site.
The office already had its finishes in place, so the structures travelled in protective film and were assembled on site by our own crew.
One shade of green runs through the arches, grids, daybeds and café frames, so the whole floor reads as one structure.
