Send drawings
Projects / Offices

High-rise office, Moscow

ClientOffice on an upper floor of a Moscow tower
DesignThe client's interior designer
FabricationKARLSON metal workshop, Bronnitsy
InstallationOur own team, completed in August 2025
Office café with green steel arches, climbing plants and ring lights high above Moscow
The brief

Green steel arches that run along the windows and rise into the ceiling, with daybeds set right at the glass. The designer drew it for an office high above the city, and we had to build it there, inside a finished fit-out.

We made the arches along the windows, the ceiling grids, the daybeds at the panoramic glazing and the planted frames in the café zone. Every element was welded and painted in our workshop in Bronnitsy, then assembled and installed on site by our own team. Installation was completed in August 2025.

4structure types: arches, ceiling grids, daybeds, planted frames
Greenpaint matched to the design
Ownteam for assembly and installation
2025installation completed in August
Workshop to site

The arches before they left the workshop.

Every arch was welded, painted and assembled in Bronnitsy first, then wrapped in film and taken to site. Drag the slider to see the same structures in the workshop and installed along the windows.

Green steel arches wrapped in protective film in the KARLSON workshop in Bronnitsy
The same arches installed along the windows of the office
In our workshopOn site
Café lounge framed by green steel arches with climbing plants and city views
Green steel arches along a floor-to-ceiling window
Daybed with a green steel frame and a grey mattress at a panoramic window
Green steel ceiling grid with circles around a ring light
Row of daybeds under green arches along the glazing
Café zone with a communal table, open shelving and planted window frames
Planted steel frames behind a marble-top communal table
Arched steel frames rising from the window line into the ceiling
What we made

Scope of supply

Arches along the windows, rising into the ceilingwelded steel, painted green
Ceiling gridswelded steel, painted green
Daybeds at the panoramic windowswelded steel frame with mattress
Planted frames for the café zonesteel frames with mesh for climbing plants
How we did it

Built in the workshop, assembled high above the city.

Every arch, grid and frame was welded and painted in our workshop in Bronnitsy, and the structures were assembled there first before they went to the site.

The office already had its finishes in place, so the structures travelled in protective film and were assembled on site by our own crew.

One shade of green runs through the arches, grids, daybeds and café frames, so the whole floor reads as one structure.